The Bridge Over Nepean River Project Construction Essay

The undertaking consists of supplying design and building direction services for the development of a Pedestrian Bridge over the Nepean River. The intent of the undertaking is to supply local community occupants and visitants to the country with an easy entree over to either side of the River Bankss. The span is to be built as an inducement of the Local Government Area ( LGA ) of Penrith. The plan has been developed to fancify the milieus, whilst following with the councils ‘ vision of go toing the demands of the natural militias. The river flows in an unpeopled H2O catchment country into the Nepean Dam which supplies H2O for the Sydney part. The proposed span crossing is required at a subdivision of the river that spans between 90 – 100 meters.

Rational of Design

A Steel-Truss design was set for the building of the span. This was due to the councils thorough research which indicated that this span system would be the most appropriate, given the environmental fortunes for the undertaking. This included the mean span of the Nepean River and its soil/load conditions. Research besides concluded that this design would adequately back up the burden of the expected intent and its current location. Each country meets and complies with the councils guidelines.

We will write a custom essay sample on
The Bridge Over Nepean River Project Construction Essay
or any similar topic only for you
Order now

Introduction

Penrith City Council has requested proposals from qualified design and building direction houses. They have been asked to supply professional services for the conceptual survey, design, coordination and readying of the relevant contract certifications for the installing of the proposed span over the Nepean River. The span is to cross across the river over a distance of 100 meters and is to be used by walkers to supply them with the agencies to traverse from one side of the river to the other.

Literature reappraisal

Undertaking Problem

The chief job that our undertaking is taking to work out is of both prosaic safety and easiness of entree to public countries within the recreational park. The lone entree across the Nepean River at the current location is via the M4 and The Great Western Highway ‘s vehicular Bridgess. Between the two Bridgess is a spread which stretches an estimation of 3 kilometers without any entree across the river. This forces pedestrians to traverse the river utilizing crossings with a high traffic volume. This can be unsafe for walkers particularly those traversing with immature kids. Between these two current Bridgess there is Regatta Park and River Road Reserve which are both popular diversion countries.

The Solution

We propose that a prosaic span will be constructed between the M4 and The Great Western Highway. The span will supply direct and safe entree for walkers to and from Regatta Park and River Road modesty from the opposite side of the river. We estimate that an norm of 40-50 people will utilize the span each twenty-four hours.

The Design

Our research indicated that the most suited design of span for our undertaking would be a steel truss span. This manner can suit spans of up to 150 meters ; hence, as our span has a span of 100m it was the best pick for the location and usage. Other alternate options included beam, cantilever and suspension Bridgess. A semilunar manner design provides the span with aesthetic entreaty.

Materials

Weathering steel was used in the design for the span because it gives high strength and lastingness along with a comparatively low weight and easy hard-on. The steel must be galvanised to increase the life of the span by forestalling corrosion. A figure of stuffs could hold been used for the adorning including asphalt, concrete and lumber. Yellow Pine lumber was chosen as it is comparatively inexpensive and aesthetically appealing.

Specification of span

General

These specifications are for a to the full engineered clear span span of welded steel building and shall be regarded as minimal criterions for design and building. The Engineer ‘s determination shall be final.A All providers will be rejected if the applied scientist decides that the contractor does non run into measure uping standards. The span provider shall be to the full certified by all the relevant governments to bring forth fancied structural.

Bridge Dimensions

Bridge manner:

The span is a semilunar series manner design of steel truss span.

Bridge Span:

The entire span from support to back up will be 100 meters.

Bridge Width:

The interior clear breadth of the span shall be 2.5 meters.

Other Bridge Dimensions:

Horizontal safety rails shall be placed on the construction up to a minimal tallness of 1.25 meters above deck surface.A Rails shall be placed so that they would forestall a 4 inch sphere from go throughing through the truss.

Bridge Camber:

The span shall hold a perpendicular camber to countervail dead burden and look to be level.

Design

Uniform Live Load:

The span shall be designed for an equally distributed unrecorded burden of 4.1 kN per square meter of deck.A

Wind Load:

The span shall be designed with a minimal air current burden of 1.5 kN per square meter on the full perpendicular country of the span.

Deflection:

The perpendicular warp of the truss due to prosaic unrecorded burden shall non transcend L/500.A For prosaic comfort, the minimal unrecorded burden used for the warp look into shall be a lower limit of 600 lbs per direct pes of the bridge.A The horizontal warp due to sidelong air current burden shall non transcend L/500 of the span length.

Floor Decking:

Stay-in-place galvanized metal signifier deck shall be used and shall be a lower limit of 22 pot. Metal signifier deck shall non be considered every bit moving as composite reinforcing. Metal signifier deck shall be secured to the support members with fasteners or dyer’s rocket. Metal signifier deck panels shall be of a length to cross a lower limit of two bays of the truss supports. Metal signifier deck shall be designed for a building unrecorded burden of either 0.95 kN per square meter. Dead burden warp due to normal weight moisture concrete shall be limited to L/180 or 3/4 ” . Field splices shall be bolted with High Strength bolts.

Design Standards:

The design of the span shall be in conformity with the Australian Bridge Design Code.A

Materials

– All structural members shall be made of enduring steel and have a minimal thickness of at least 3/16 of an inch.

– Steel material shall be corrosion immune high-strength low metal stuff with a minimal corrosion index of 5.8.A All members of the truss and deck system shall be fabricated from square/rectangular hollow structural subdivisions ; broad rim may be used for floor beams.A Open ends of stations and floor beams shall be capped.

– Wood adorning shall be No. 1 class Southern Yellow Pine.A Wood adorning shall be treated with a sufficient sum of preservative. The wood adorn shall be designed for a lower limit of 5 kN per square meter local lading status. Floor planks shall be attached with at least two plated fasteners where boards cross-supporting members.

– Field splicings shall be bolted with High Strength bolts. Welding stuffs shall be in rigorous conformity with the Australian Welding Society ( AWS ) Structural welding code.A Filler metal will fit features of the base material.A Welders will be certified in conformity with AWS. All dyer’s rockets are to be 100 % visually inspected.

Railings and Accessories

All railings shall hold a smooth inside surface with no bulges or depressions.A All terminals of angles and tubes shall be closed and land smooth.A Railings shall be a minimal tallness of 1.25 meters above the span deck.

Safety Tracks:

Continuous tracks shall be located on the interior of the trusses.

Toe Home plate:

A 5 inch steel channel shall be located 50mm above the floor deck.

Rail Type:

Vertical Picket safety rails shall be placed on the construction up to a minimal tallness of 1.25 meters above deck surface. Rail shall be placed so that they would forestall a 4 inch sphere from go throughing through the truss. The tracks are to be placed on the interior of the truss. Vertical Pickets shall be the standard A? ” Lookouts welded to less than a 4 ” gap. The panels are designed with A? ” and 3/8 ” home bases.

Delivery and Erection

Delivery is made to a location nearest to the site, which is easy accessible to normal, over the route tractor dawdler equipment.A All trucks presenting span stuffs will necessitate to be unloaded at the clip of arrival.A Erection of the span construction is to be done by a certified erector.

Swot

Builders Perspective

Strengths

Failings

– Large Building Space

– Client has significant fiscal power

– Committed staff with skills/knowledge to acquire the occupation done

– Plenty of edifice infinite

– Work force readily available

– Working around an bing natural modesty.

– Development in an country that will make more traffic around natural modesty.

– Geting big edifice equipment and machinery on site without impacting milieus.

Opportunities

Menaces

– Great chance for a major undertaking

– Making new contacts in the commercial retail industry

– Creates goodwill for the house

– Weather

– Environmental issues

– Monetary value wars from other project direction houses

– Rivals offering cheaper options

– Building site hooliganism

– Failure to present undertaking on clip may impede our houses repute

Soil categorization may do jobs

Strengths

Large Constructing infinite: The infinite around the Nepean River in between the M4 Motorway and The Great Western Highway is about 3kms in length leting for greater infinite for site constitution and operation.

Client has significant Financial Power: As the client that is suggesting the building is the LGA of Penrith City council, whom maintains authorities backup of the development for the improvement of the Greater Western Region, it has virtually limitless pecuniary resources.

Committed staff with skills/knowledge to acquire the occupation done: Our house has staff with over 30 old ages of experience and expertness within the civil building industry and public plants, we specialise in presenting undertakings on clip and within budget. Leting us with the advantage of the cognition and resources required to successfully set about such a undertaking.

Plenty of constructing infinite: The site immediate to where the span is to be constructed is free from any signifiers of hinderances that may impact building as there are no next edifices that can be affected during or after building by the development of this span.

Workforce readily available: Our work force and contractors are readily available to get down building every bit shortly as the green visible radiation to get down is given.

Failings

Working around an bing natural modesty: As the environing country is a natural modesty excess safeguard and clip must be taken into history in keeping the milieus and guaranting that no harm occurs to the waterways and nature environments.

Developing in an country that will make more traffic around natural modesty: Traffic will necessitate to be maintained much more strictly around the site, as two major motor arterias surround the building zone. A comprehensive traffic control program will necessitate to be developed to keep traffic flow.

Geting big edifice equipment and machinery on site without impacting milieus: As the undertaking is to be completed in an environmentally sensitive country, comprehensive site planning will necessitate to be undertaken to avoid any long permanent negative impacts on the natural environments.

Opportunities

Great chance for a major undertaking: A undertaking such as this will let our house to one time once more commit to the local community and supply much needed local substructure, leting greater consciousness within the populace of our house ‘s ability to set about such a undertaking and finish it diligently.

Making new contacts in the commercial retail industry: Business chances and acknowledgment is abundant on such a authorities undertaking leting for huge positive media attending, assisting the house to derive much more merited promotion as one of the best building direction and technology houses in the concern.

Creates good will for the house: Once the undertaking is completed ; goodwill will be created towards the house, leting other local authorities councils to recognize the house ‘s ability and potency for finishing undertakings which are environmentally sustainable ; and at a high satisfactory degree for all stakeholders.

Menaces

Weather: During Construction weather conditions may impact the environments or cause holds in building and undertaking bringing.

Environmental issues: Considerable attention must be taken non to negatively impact the local environments. As a effect the repute of the house may be hindered and heavy mulcts are besides applicable.

Monetary value wars from other project direction houses: Other civil building houses may use for stamp and make a monetary value war for undertaking bringing.

Rivals offering inexpensive options: Other houses may offer cheaper bringing to the client, being a authorities undertaking and through the public oculus, cheaper may be seen as the manner to travel.

Building site hooliganism: Due to the openness of the site, it has a higher opportunity of being vandalised by natural or an unnatural beginning such has floodwater.

Failure to present undertaking on clip may impede our house ‘s repute: The failure to present the undertaking on clip will greatly impact the house ‘s repute of being one that prides itself on on-time undertaking bringing with minimum hold.

Soil categorization may do jobs: The local dirt may do jobs being surrounded by wet bushlands and a waterway. Extensive testing and boring samples may be variable around the site.

Costss

Materials

Item

Unit of measurements required

Price per unit

Entire cost

Hot dipped galvanizes enduring structural steel

250 T

$ 1200/t

$ 300 000

Treated Southern Yellow Pine adorning

250 M2

$ 30/m2

$ 7 500

Thunderbolts, prison guards and fixtures

$ 2 500

Galvanized steel bannisters

210 m

$ 20/m

$ 4 200

Anchoring system

2

$ 1 000

Entire cost of stuffs

$ 315 200

Plant and Equipment

Item

Unit of measurements required

Rate per unit

Time required

Entire cost

Excavator

2

$ 125/day

1 twenty-four hours

$ 250

Compactor

2

$ 60/day

1 twenty-four hours

$ 120

Crane

1

$ 1100/day

7 yearss

$ 7 700

Trucks

3

$ 100/day

10 yearss

$ 3 000

Welding equipment

2

$ 1750

Purchased

$ 3 500

Assorted tools

$ 5 000

Safety equipment

1 set

$ 500

Purchased

$ 500

Entire cost of works and equipment

$ 20 070

Labor

Item

Unit of measurements required

Rate per unit

Time required

Entire cost

Design squad

2

$ 25 000

$ 50 000

Machine operators

8

$ 25/hr

72 hours

$ 1 800

General labor

4

$ 20/hr

480 hours

$ 9 600

Building squad

5

$ 40 000

$ 200 000

Entire cost of labor

$ 261 400

Other

Item

Unit of measurements required

Rate per unit

Time period required

Entire cost

Site office

1

$ 75/week

24 hebdomads

$ 1 800

Site comfortss

1

$ 60/week

24 hebdomads

$ 1 440

Secure storage

1

$ 25/week

24 hebdomads

$ 600

Entire other costs

$ 3 840

Sum Cost

$ 600 510

Best Builders Construction Best Builders Construction Pty Limited GPO Box 2000 Sydney New South Wales 2000, Australia

Telephone: 02 999 9 00 00 Fax:02 9999 0001 Electronic mail: info @ bbconstructions.com.au

Tender papers

Nepean River

Steel Truss System Bridge – Tender Document

Best Builders Construction

Revised Entire Lump Sum Tender Offer

Civil and Bulk Earthworks – Steel Truss Bridge Erection

We are pleased to rede the revised ball amount stamp offer for the above undertaking is as follows:

Civil and Bulk Eathworks… … … … … … … … … … … … … … … … … … … … … … … … … … … … .. $ 281,470

Steel Truss Bridge Erectionaˆ¦ … … … … … … … … … … … … … … … … … … … … … … … … … … .. $ 315,200

Site comfortss… … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … $ 3,840

Revised Entire Lump Sum Tender Offer… … … … … … … … … … … … … … … … … … … … $ 600,510

The above figures exclude the Goods and Services Tax.

Please refer to the affiliated appendices for dislocation of the above monetary values, every bit good as a elaborate papers list upon which this offer is based.

Our revised ball amount stamp offer is capable to the undermentioned makings.

1. All conditions and makings identified in the Best Builders Lump amount stamp for the design & A ; building of the Steel Truss System Bridge over the Nepean River offer dated 01.01.2010 remain current and still use, unless noted otherwise in this offer.

2. Any Nepean City Council generated fluctuations to the range of plants encompassed in the BCA Lump Sum Tender for the Design and Construction of the Steel Truss Bridge over the Nepean River offer dated 01.01.2010 are excluded from this offer.

3. Geotechnical Probe costs have been excluded from the stamp monetary value.

4. Engineers design fees are included within the stamp monetary value.

5. Site Preparation including general site glade is included within the stamp monetary value.

6. Excavation to foundations and to level and make full site is included within the stamp monetary value.

7. Erection of formwork for the span foundations and columns is included within the stamp monetary value.

8. Pouring of concrete for foundations and columns is included within the stamp monetary value.

9. Erection of the steel truss system is included within the stamp monetary value.

10. Decking of span span, both the galvanized metal and southern xanthous pine lumber decking is included within the stamp monetary value.

11. Installation of railings and accoutrements including the perpendicular lookout safety tracks are included within the stamp monetary value.

12. General clean up including the remotion of waste and extra stuffs every bit good as landscaping item is included within the stamp monetary value.

13. Council, authorization and public-service corporation fees and charges are excluded from this offer.

14. No allowance is included in our ball amount stamp pruice for any conditions of blessings imposed by Local Authorities which require any works other than those identified in the Development Application drawings listed in this offer.

15. No allowance is made for legislative alterations & A ; concluding blessing conditions from Statutory & A ; Local Authorities.

16. This ball amount stamp monetary value remains fixed for 20 one ( 21 ) yearss.

17. All plants on site are deemed to be performed during normal on the job hours.

18. This ball amount offer is capable to understanding of contractual conditions.

Should you hold any questions or necessitate farther information, delight make non waver contact the undersigned on 02 9999 0000.

Kind Regards,

___________________________

Michael Brogan

Construction Contract

Best Builders Construction Best Builders Construction Pty Limited GPO Box 2000 Sydney New South Wales 2000, Australia

Telephone: 02 999 9 00 00 Fax:02 9999 0001 Electronic mail: info @ bbconstructions.com.au

Nepean River Steel Truss System Bridge – Crescent Series Design

Construction Contract – Formal Instrument of Agreement

Parties involved:

BB Constructions and Nepean City Council

1.Outline

This Steel truss system, semilunar series design span will cross 55 meters at a breadth of 2.5 meters, including horizontal safety tracks at a tallness of 1.25 meters above the deck surface. All structural members shall be made of corrosion immune enduring steel. Stay-in-place galvanized metal shall be used to organize deck, the wood decking is to be constructed utilizing No. 1 class Southern Yellow Pine. The span shall be designed with a minimal air current burden of 1.5 kN per square meter on the full perpendicular country of the span. The span shall be designed for an equally distributed unrecorded burden of 4.1 kN per square meter of deck.A

2.General Scope of Works

Site Preparation

– General site glade

Excavate to degree and make full site

– Excavate foundations

– Fill site where necessary

– Degree site

Erect formwork

– Erect formwork for span foundations and columns

Pour concrete for foundations and columns

– Pour concrete for span foundations and columns

Erect steel truss system

– All structural members shall be made of enduring steel and have a minimal thickness of at least 3/16 of an inch every bit good as being corrosion immune high-strength low metal stuff with a minimal corrosion index of 5.8.

Decking of span span

-Stay-in-place galvanized metal signifier deck shall be used and shall be a lower limit of 22 pot.

– Wood adorning shall be No. 1 class Southern Yellow Pine.A Wood adorning shall be treated with a sufficient sum of preservative.

Installation of railings and accoutrements

-Vertical Picket safety rails shall be placed on the construction up to a minimal tallness of 1.25

General clean up

-Removal of all waste stuff

-Landscaping Detail

3. General Footings and Specifications

Contract Sum

-The work is to be completed for a sum of $ 600,510, Six hundred thousand five 100s and 10 dollars.

Completion of Work under the Contract

-The contractor must put to death the work under the contract in conformity with the contract.

Payment of Contract Sum

-The chief must pay the contractor the contract amount in conformity with the contract.

Trust

-The contractor acknowledges that:

( 1 ) The chief enters into the contract as agent for the responsible entity ; and

( 2 ) It must non do any claim against the responsible entity or the trust under, originating out of, or in any manner in connexion with, the contract.

Guarantees

-Each party represents and warrants to the other party that:

( 1 ) It has full power and authorization to put to death the contract and execute its duties under the contract

( 2 ) The contract has been punctually executed by it ; and

( 3 ) The duties undertaken by it and put out in the contract are valid and adhering in conformity with the footings of the contract.

Execution by Attorney where this contract is executed by an lawyer, that lawyer, by executing, declares that it has no notice of recovation, expiration or suspension of the power of lawyer under which it executes the contract.

Disputes

-Disputes are to be handled in a civil mode, without tribunal audience ( if possible ) , each party is to move in an ethical mode and make everything possible by realistic agencies to avoid such differences.

4. Payment Agenda

-The contractor is to be paid on a monthly footing in conformity with monthly advancement and fluctuations claims. At the terminal of the full period the contractor is to be paid the contract amount in full, including GST.

5. Agreement of Footings

BCA hereby confirm that the ball amount to transport out the in agreement range of plants is $ 600,510, Including GST.

Signed ______________________________ Michael Brogan, BCA Constructions

Dated _______________________________

Nepean City Council hereby hold to pay BCA buildings a amount of $ 10,000,000 to transport out the plants set out in the contract. This offer is valid for 28 yearss as of 30.10.2010

Signed ______________________________ Adam Campbell, Nepean City Council

Dated _______________________________

Hazard direction

Technical hazard direction

There are several proficient hazards that must be managed for the undertaking. All the design certification must be complete and in order to avoid premises and disagreements in the building of the span. The specifications must be appropriate to the undertaking in order for the undertaking to be completed successfully and in conformity with the design inside informations. A full site probe is required so that the right building methods and designs can be implemented and to forestall the happening of proficient failures such as dirt failures. Beginnings and providers of all stuffs must be determined and their handiness ensured with sufficient clip to supply the needed stuffs at the allocated clip.

Financial hazard direction

The fiscal hazards involved in the undertaking include cost overproductions from jobs such as under-estimating costs, clip holds, material wastage and unforeseeable jobs. A hazard direction officer will be appointed to the undertaking to make a hazard direction program and supervise the public presentation of the undertaking.

Environmental hazard direction

The impact to the local environment will be minimised for the undertaking. The undertaking has multiple hazards to the environment such as taint of the river H2O and dust, noise and air pollution. An environmental direction program has been created and will be in operation for the full undertaking. This will supply guidelines for protective barriers and environmentally safe work patterns.

OH & A ; S Management Plan

Undertaking Name: –

Pedestrian Bridge Over Nepean River

Table of contents

Contentss 1

TITLE PAGE 4

Task Done By Each Person 5

Abstract 6

Background 6

Rational of Design 6

Introduction 7

Literature review 7

Undertaking Problem 7

The Solution 8

The Design 8

Materials 8

Specification of span 8

General 9

Bridge Dimensions 9

Bridge manner: 9

Bridge Span: 9

Bridge Width: 9

Other Bridge Dimensions: 9

Bridge Camber: 9

Design 10

Uniform Live Load: 10

Wind Load: 10

Deflection: 10

Floor Decking: 10

Design Standards: 11

Materials 11

Railings and Accessories 12

Safety Tracks: 12

Toe Plate: 12

Rail Type: 12

Delivery and Erection 13

SWOT 13

Builders Perspective 13

Strengths 14

Failings 15

Opportunities 16

Menaces 18

Costss 19

Materials 19

Plant and Equipment 19

Labour 19

Other 20

Tender papers 20

Construction Contract 23

Risk direction 26

Technical hazard direction 26

Financial hazard direction 27

Environmental hazard direction 27

OHHYPERLINK “ # __RefHeading__164334_1526711549 ” & amp ; HYPERLINK “ # __RefHeading__164334_1526711549 ” S Management Plan 27

1.Contract Detailss 30

2.Safety Policy 31

3.Responsibilities 32

4.Scope and Construction Activity Details 33

5.Safe Work Method Statements 33

6.Hazard HYPERLINK “ # __RefHeading__164346_1526711549 ” & amp ; HYPERLINK “ # __RefHeading__164346_1526711549 ” Risk control registry 34

7.First Aid and Injury Management 35

8.Emergency Procedures 35

9.Public Protection 36

10.Site Rules 37

11.Incident coverage and probe 38

12.Induction Requirements 39

13.Chemical Management 39

14.Safety Monitoring 40

15.Sign Off 40

Decision 41

Recommendation 41

Mentions 42

Appendix 1 – Agenda 43

Appendix 2 – Architectural Drawings 44

Appendix 3 – Infinitesimal meetings 45

Contract Detailss

Contractor name:

Best Builders Pty Ltd

Contractor ABN:

56984236548

Contractor reference:

457 Johnsten Rd

Bella Vista

Telephone: – 02 96587459

Contractor Safety representative:

Sunny Lal

Contract description:

Location of plants:

Penrith

Over Nepean River

Undertaking Officer

Adrian Chaghoury

Timing of plants ( approximate ) :

Start day of the month:

26/10/2010

End day of the month:

22/12/2011

Safety Policy

An of import facet of any development is that of safety of site personal during the building phases of a undertaking. Not merely is the providing of a safe work environment required by jurisprudence through administrations such as WorkCover and its codification of pattern with the Australian Safety Standards, it is besides the duty of each personal to be cognizant of the safety of themselves and to guarantee that their equals abide by the regulations, ordinances, safety guidelines and protective steps outlined below to make safe working atmosphere, and to assist understate any hurt or work topographic point accidents on site.

To ease with the undertaking of constructing a span over the Nepean River in Penrith, Management has created a Safety Management Plan ( SMP ) that will turn to the Occupational Health And Safety ( OH & A ; S ) issues throughout the undertaking.

Site Specific Safety Rules are to be purely adhered to. If it is found that site personal ( s ) are non following the undermentioned regulations efficaciously, rough punishments such as suspension or dismals will be enforced.

Duties

The Site Safety Management Plan for this peculiar site has been produced and will guarantee that site safety regulations are displayed on assorted locations of the site. The program inside informations all safety instructions. All site personal is to be inducted on site on initial beginning of work on the site, it should besides be noted that if there are any alterations made to the site, all personal shall be revised on the new jeopardy countries. The current site safety regulations besides states that any short-run visitants must be escorted at all times whilst on site. It is of import to observe that lone workers whom have completed a general safety initiation class and hold cogent evidence of their satisfactory completion ( VIA a green/white card ) will be able to work on site.

The site safety officer for the site is: Cheery Lal and a site safety commission will be established.

Scope and Construction Activity Details

List Major activities

Excavations

Managing demolished stuff

Manual handling of equipment/ stuffs

Operating machinery

Constructing foundation

Pier building

Superstructure building

Span building

Segment casting.

Safe Work Method Statements

Management, through the audience with WorkCover has provided Safe work method statements ( SWMS ) for all the work activities that have a high hazard evaluation. These should be read followed and signed prior to the beginning of such work.

Hazard & A ; Risk control registry

First Aid and Injury Management

All incidents accidents including near girl that occur on the work site must be reported to the site supervisor.

The ingestion of intoxicant or illicit drugs must non be consumed on the premises or before or during work hours.

Any individuals affected by intoxicant or drugs will be asked to go forth the worksite and may be charged and prosecuted under work safety ordinances and hazard to self or others.

Emergency Procedures

All forces are required to run into at the exigency meeting point at the clip of an exigency, site safety officer is to be informed instantly and the appropriate exigency services are to be contacted.

Public Protection

All jeopardies to the populace are to be identified and the best method for extinguishing or commanding the jeopardies are to be adhered to. Evaluation of the hazard or injury that may be caused is to be calculated before beginning of work and physical precautions to avoid or cut down hurt and prevent belongings harm is to be implemented. All site plants are to incorporate barriers around possible jeopardies, warning marks and prophylactic lighting is to be displayed where necessary. Additional public safety protection methods to be followed are:

Traffic accountants are to airt traffic and people.

A impermanent by-pass is to be created for traffic and people.

Level wheelchair and prosaic is to be provided for entree around the country

Additional lighting will be used during dark plants and inactive sight

A sufficient clearway is to be maintained around the margin for excess public safety.

The full building site is to be enclosed via fence

Spotters are to be used when working with works and equipment

Site Rules

Site Safety Rules:

Site Safety regulations must be displayed on site.

All site personal must be inducted to the site on initial beginning and following any alterations to the site.

Short-run visitants must be escorted at all times while on site.

Merely staff with completed general safety initiations and are transporting their green card may be allowed to work on-site.

Safe work method statements ( SWMS ) must be prepared for work activities that have a high hazard evaluation.

All staff must adhere to general housework to guarantee entree to fire asphyxiators, eye-lotion Stationss, exigency showers foremost aid kits and exigency issues are clear at all times.

Trip jeopardies and travel way obstructions must be kept clear.

Personal Protection Equipment:

Personal protective equipment ( PPE ) must be worn at all times on site. And will be purely enforced.

PPE required on site Include:

Eye protection – Safety goggles to avoid oculus harm due to winging objects or dust.

Hand protection – safety baseball mitts to protect against cuts, scratchs, matchwoods or chemical exposures.

Head Protection – Hard Hats – To protect against falling objects, inadvertent caput contact with electrical jeopardies.

Hearing Protection – ear muffs must be worn to protect against high noise harm to ears.

High visibleness dressing – Fluorescent xanthous safety vesture is to be worn by all staff to let for high visibleness by all machine operators.

Safety footwear – Approved safety footwear is required by all site personal, to assist cut down the hazard of hurt to pick by falling objects.

Sun protection – protection against the Sun is required when working out-of-doorss, safety cogwheel such as chapeaus, long sleeved shirts and UV protection pick must be used.

Incident coverage and probe

All incidents are to be reported to the on-site safety director. All incidents will be monitored and investigated consequently through work screen and the houses OH & A ; S policies.

Initiation Requirements

Initiations for contractors are to be completed in conformity with the Contractor Safety Induction procedure.

ALL WORKERS MUST HAVE UNDERGONE THE OHS CONSTRUCTION SAFETY INDUCTION ( BLUE CARD ) BEFORE WORKING ONSITE

Chemical Management

It is of import to take attention with the handling, storage, packaging and bringing of goods onsite particularly due to its un-level nature.

Storage of building Materials and substances must be stored individually on degree, house and clear land. Bulk stuffs such as cold mix, sums, littorals and route base should be stored individually to avoid taint.

Materials under menace to degradation must be stored under shelter and off from vehicle or prosaic entree.

Material Safety Data Sheets ( MSDS ) should be purely followed on all locations on site.

Merchandises must be sporadically inspected for shelf life termination and if any merchandises are expired it must non be used and disposed of suitably.

Safety Monitoring

Safety Awareness

All safety marks and instructions on site must be purely adhered to.

Any Equus caballus behavior or practical gags on site that endanger personal safety will non be tolerated.

Safety inspector will be on site to supervise all safety conformity.

Sign Off

Safety Management program approved by:

Undertaking Manager: Adrian Chaghoury Sign: ______________

Safety Manager: Sunny Lal Sign ______________

Site Manager: Dane Lollback Sign _______________

Head OHS Com: Mike Brogan Sign _______________

Date: ___/___/___

Decision

The design and building of the prosaic span supplying entree across the Nepean River between the M4 and Great Western Highway Bridgess will give a solution to the job of safe and easy entree to Regatta Park and River route Reserve recreational countries. The most suited designs and stuffs have been selected for the undertaking to give the coveted result. All the undertaking hazards will be managed and the harm to the environment minimized. Overall we estimate based on our rating the undertaking will be a entire $ 600 510 and will take about 14 months to build.

Recommendation

We recommend that all options should be analysed before make up one’s minding on the best location, design, and building methods. Research on ways to guarantee that environmental impacts are minimised should be in-depth as the undertaking is traversing a major waterway.

×